Guyana requests EOIs for new bridge under BOOT model

Subscribe to our newsletter and get the latest news and business opportunities in your inbox
Guyana requests EOIs for new bridge under BOOT model

The Government of Guyana (GoG) has invited Expressions of Interest (EOI) from local and foreign parties interested in being a partner in the design, construction and financing of the New Demerara River Bridge (NDRB).

According to the notice, the project will be implemented using a Build-Own-Operate-Transfer (BOOT) model.

Although three possible sites have been proposed in the Pre-Feasibility Study for the new bridge, final decision is still pending. A study is being conducted which looks at all the different types of bridges that could be constructed, but government is looking to build a fixed structure.

A pre-feasibility study for the construction of the NDRB has been completed and can be accessed from the Ministry of Public Works website. The URL for the Ministry’s website is www.wsg.gov.gy,

The Demerara Harbour Bridge is a 6,074-foot (1,851 m) long floating toll bridge. It was commissioned on 2 July 1978. The bridge crosses the Demerara River 4 miles (6.4 km) south of the Guyanese capital Georgetown.

Deadline for submission of Expressions of Interest: 20 December, 2013.

Request for Expressions of Interest: http://images.mofcom.gov.cn/gy/201311/20131114031549687.pdf

Share this news

Join us

In order to get full access to News section, you must have a full subscription. You can check all the benefits of becoming a member and purchase a subscription on our membership page.