RFQ issued for Runway 13R-31L Reconstruction Project in Houston

Subscribe to our newsletter and get the latest news and business opportunities in your inbox

Houston Airport System (HAS) has requested a qualified firm to develop design plans and construction documentation for the Reconstruction of RUNWAY 13R-31L in Houston, Texas, USA.

The qualified Engineering Firm will be responsible for: 

  • Preliminary Engineering Study (Phase I)
    • Develop alternative solutions, layout, constructability, and operational phasing;
    • Prepare a written Preliminary Engineering Report (PER); and
    • Document investigations, assessments, recommended design solutions, construction budget estimates, schedules, exhibits, and illustrations
  • Final Design Phase (Phase II)
    • Submit formal review submittals; and
    • Include drawings, specifications, and semi-detailed cost estimates
  • Construction Phase (Phase III)
    • Furnish construction services;
    • Periodic observation of the work;
    • Consulting with HAS regarding quality, execution, and changes;
    • Review of shop drawings, submittals, and test reports;
    • Issuing clarifications or changing documentation; and
    • Construction quality coordination.

The last date to submit responses is August 1, 2023. More information about this tender could be found on our Bussiness Opportunity page here.

Share this update