Czech infrastructure manager Správa železnic has launched a tender for a feasibility study into a proposed Prague-Most high-speed rail connection, known as VRT Poohří.
The study will evaluate nine potential routes to reduce travel time from two hours to just 40 minutes. The proposed Prague–Most high-speed line would diverge from the planned Prague–Dresden corridor, with two possible junction locations under consideration: one near Roudnice nad Labem in the Ústí Region, and the other near Nová Ves in the Central Bohemian Region.
The study will evaluate whether the Prague-Most line should serve both passenger and freight traffic, as is planned for the section between Litoměřice and Dresden, or be limited to passenger services only. Design speeds of 200, 250, and 320 km/h will be assessed. Additionally, the study will examine necessary upgrades to existing regional lines that would link to the new route, such as the Louny–Žatec corridor.
The study is expected to be completed in 2027.
The Czech Republic has announced the tender for the purchase of 133 electric trains along with long-term maintenance, with a total value of US$3.3 billion. České dráhy (ČD), the nationa...
Read moreThe Czech Republic's Ministry of Transport started a competitive dialogue with four shortlisted international bidders for the construction and operation of 2 sections of the D35 motorway usi...
Read moreThe Czech Republic’s Ministry of Transport has awarded VINCI Construction two transport infrastructure construction contracts. VINCI Construction subsidiaries Eurovia CZ and Stavby mostů have j...
Read moreThe Czech Republic's Transport Ministry has inaugurated the new D4 motorway, located some 40 km south-west of Prague that will enhance the connection between the rural region of South Bohemia and...
Read moreSpráva železnic has announced the Tender for the high-speed railway line (HSR) from Velká Bíteš to Brno in Czech Republic. The section of the VRT Vysočina (HSR&n...
Read more